Our Projects

Explore our Projects

YEARPROJECTPOSITIONCOMPANYADDRESSACTIVITIESSTATUS
2019/2020GOLD PROJECTMining ConsultationsBUSOLWA GOLD MINE + ISHOKELA GOLD PROJECTPO BOX 3188, MWANZADesign of Opens Pits, Project Establishments, Operations Advisor, Tailings storage facility Design with capacity of 1MtAccomplished and commissioning on operations currently with all permits
2020GOLD PROJECTMining ConsultationsMMG SEKA MINEPO BOX 3113,SEKA MARATailings Storage Dams Project Establishments, Operations Advisor and Consultant EngineerAccomplished and commissioning on operations currently with all permits
2021/2022GOLD PROJECTMining ConsultationsMDIMI MINING INVESTIMENTP O BOX 81, CHUNYA MBEYAPreparing of all Studies done such as Geotechnical study, Hydrogeology study, Topographical maps preparations and Tailings Storage Dams Project Establishments, Operations Advisor and Consultant EngineerAccomplished and commissioning on operations currently with all permits
2023GOLD PROJECTMining ConsultationsHEXAD COMPANY LIMITEDP O BOX 8494, RWAMGASA, GEITAPreparing of all Studies done such as Geotechnical study, Hydrogeology study, Topographical maps preparations and Tailings Storage Dams Project Establishments, Operations Advisor and Consultant EngineerAccomplished and commissioning on operations currently with all permits
2024GOLD AND COPPER PROJECTMining ConsultationsCHONGYUAN HUIJIN (TANZANIA) CO. LIMITEDPO BOX 71, GEITA TANZANIAPreparing of all Studies done such as Geotechnical study, Hydrogeology study, Topographical maps preparations and Tailings Storage Dams Reports and Project Establishments, Operations Advisor and Consultant EngineerAccomplished and commissioning on operations currently with all permits
2024GOLD PROJECTMining ConsultationsGOLDEN STREAM RESOURCESPO BOX MWANZA TANZANIAPreparations of Constructions Budgeting, Constructions Review and Reports Review for TailingsAccomplished and commissioning on operations currently with all permits